|
Here are the links to the restoration process:
-
In The Beginning (March 2003)
-
The Teardown (February 16, 2004)
-
Trunk Repair (March 24, 2004)
-
Rear Panel Repair (April 18, 2004)
-
Trunk and Wheel Well Zero Rust coating. Rocker Panel Removal (May 23,2004)
-
Rocker and Wheel Well Repair (July 15, 2004)
-
Wheel Well Repair. Rocker and Wheel Well Zero Rust coating. (July, 22, 2004)
-
Rocker Panel Install. (August 7, 2004)
-
Rear Suspension Removal (August 19, 2004)
-
Left Door Pillar Repair and Rear Undercarriage Stripping (September 1, 2004)
-
Right Door Pillar Repair and Rear Undercarriage Coating (September 13, 2004)
-
Rear End Refinishing and Back Seat Floor Repair (October 25, 2004)
-
Interior Back Half Floor Repair (November 14, 2004)
-
Upper Rear Valance Repair and Spring Mounts (February 5, 2005)
-
Wheel Well Installation and Quarter Panel Repair (April 19, 2005)
-
Rear Valance and Trunk Dropdown Repairs (June 27, 2005)
-
Wheel Well and Trunk Dropdown Final Repairs (August 2, 2005)
-
Rear Quarter Panel Install (August 15, 2005)
-
Tail Panel Install (August 25, 2005)
-
Quarter Panel Cleanup, Front End Removal, Dash Repair (November 21, 2005)
-
Lower Cowl and Toe Board Repairs (April 06, 2006)
-
Lower Cowl and Toe Board Repairs-Part II (June 12, 2006)
-
Front Subframe and Suspension Disassembly (June 13, 2006)
-
Firewall Smoothing and Front Undercarriage Stripping and Coating (June 14, 2006)
-
Front Floor, Cowl Cleanup and Firewall Smoothing(July 10, 2006)
-
Front Subframe Repairs (August 29, 2006)
-
Front Suspension Restoration (August 31, 2006)
-
Front Suspension Part 1 (September, 27, 2006)
-
Front Suspension Part 2 (October 2, 2006)
-
Epoxy Primering of the Shell (October 12, 2006)
-
Core Support Repairs Part 1 (February 28, 2007)
-
Front Inner Fenders (July 27, 2007)
-
Trunklid and Rear Spoiler Initial Fitting. (July 29, 2007)
-
Shell Bodywork and Front Sheetmetal Primering (August 15, 2007)
-
Initial Pre-Assembly and Doors (September 9, 2007)
-
Radiator Support Repairs and Modifications (September 24, 2007)
-
Door Skin, Rear Bumper and Front Valances (September 26, 2007)
-
Body Mockup (October 17, 2007)
-
Initial Body Work Part 1 (May 31, 2008)
-
Initial Body Work Part 2 (June 26, 2008)
-
Polyester Primer and Trans Hump (July 15, 2008)
-
Initial Block Sanding (August 14, 2008)
-
Seam Sealing and LizardSkin (August 16, 2008)
-
Paint Part 1 (September 13, 2008)
-
Paint Part 2 (September 30, 2008)
-
Steering System and Pedals (October 31, 2008)
-
Windshield Wiper Linkage and Door Window Tracks (November 4, 2008)
-
C5 Braking Components (November 7, 2008)
-
Engine Teardown and Shortblock Buildup (November 13, 2008)
-
Gauge Install (December 30, 2008)
-
Trunk Assembly (April 11, 2009)
-
Rear Brakes and Suspension Part 1(May 2, 2009)
-
Rear Brakes and Suspension Part 2(May 3, 2009)
-
Engine Top End Assembly (June 16, 2009)
-
Engine and Transmission Installation (June 25, 2009)
-
Wheels and Tires (June 26, 2009)
-
Headlight and Cooling Fan Installation (July 21, 2009)
-
Fuel Tank (August 29, 2009)
-
Serpentine Belt System (October 3, 2009)
-
Fuel System Installation (October 7, 2009)
-
Electrical System Installation (November 14, 2009)
-
Door Hardware and Weatherstripping (November 26, 2009)
-
Exhaust System (December 5, 2009)
-
Front Bumpers, Grille and Miscellaneous Body (December 22, 2009)
-
Brake Hoses and Parking Brake Handle (March 30, 2010)
-
Windshield and Miscellaneous Body (May 8, 2010)
-
Interior Part 1 (June 1, 2010)
-
Suspension Upgrades (June 27, 2010)
-
Seats and Interior Part 2 (August 12, 2010)
-
Miscellaneous Mechanical (November 3, 2010)
-
Door Panels and Interior Part 3 (November 21, 2010)
-
TPI Serpentine Brackets (March 6, 2011)
-
TPI Install Part I (June 3, 2011)
-
TPI Install Part II (July 22, 2011)
-
Vintage Air Install Part I (July 26, 2011)
-
Vintage Air Install Part II (August 7, 2011)
-
TPI Install Part III (December 8, 2011)
-
Roller Rocker Install (January 22, 2012)
-
Vintage Air Install Part III (September 15, 2012)
-
Front Spoiler and Miscellaneous (September 20, 2012)
-
Super T10 Transmission Rebuild (March 3, 2013)
-
Stealth Ram Intake Install (March 6, 2013)
-
X-Pipe Install and MSD 6AL Install (February 16, 2014)
-
Radio Install (May 18, 2014)
-
LS6 Install Part 1 (September 8, 2014)
-
LS6 Install Part 2 (September 22, 2014)
-
LS6 Install Part 3 (September 29, 2014)
-
LS6 Install Part 4 (October 4, 2014)
-
Underhood Dress Up Items (May 19, 2016)
|